TATA POWER
Q1 FY13 RESULTS
SYNOPSIS
Ø
Generation
capacity crosses 6000 MW
Ø
Achieves
Commercial Operations of 525 MW Unit 2 at Maithon Project and 800 MW Unit 2 of
Mundra UMPP
Ø
Department
of Energy, Government of South Africa
announced Cennergi (South African JV with Exxaro) as preferred bidder for two
wind projects of 234 MW
Ø
Signs
a long term coal supply agreement and right to 26% ownership with PT Antang
Gunung Meratus, Indonesia.
Ø
25
MW Solar plant in Mithapur crosses 11000 MWh units milestone.
Ø
Company
files petition with CERC for tariff revision for Mundra UMPP. Unit 2 of Mundra UMPP achieves commercial operation in
record time.
PERFORMANCE HIGHLIGHTS
Q1FY13: CONSOLIDATED
Ø
Q1 FY13 Revenues increased 25% to Rs.
7253.89 Cr as compared to Rs. 5824.51 Cr in Q1 FY 12.
Ø
PAT stood at Rs.
145.93 Cr as compared to Rs. (628.75 Cr) in Q4FY12 and Rs. 430.44 Cr in
Q1FY12. This is mainly due to lower
profit in Coal Companies owing to lower price realization and higher cost of production, higher interest and
depreciation cost due to commissioning of Mundra and Maithon units and reversal
of revenues due to change in effective date of MYT regulations in Mumbai.
Ø
On
consolidated Segment-wise performance for
the quarter, Revenues from Power business has increased by 30% at Rs.
4824.01 Cr as compared to Rs. 3720.30 Cr in the Q1 FY 12.
Ø
Revenue from Coal Business was
up by 14% at Rs. 2265.04 Cr as compared to Rs. 1990.69 Cr in the corresponding
period last year.
Ø
PBIT from Power Business was at Rs.
578.24 Cr as against Rs. 627.0 Cr in the previous quarter last year, a
reduction Rs. 155 Cr mainly due to shifting of MYT regime to 2012-13 onwards in
Mumbai.
Ø
PBIT from Coal Business stood at Rs. 257.61 Cr as compared
to Rs. 750.07 Cr reported in the Q1 FY
12. Profits were lower in Coal Companies due to lower price realization and
higher cost of production. Last year‟s PBIT was after capitalization of Rs. 210.65 Cr of deferred stripping costs. From 1st
Jan 2012 no capitalization of deferred stripping cost is being done.
Q1 FY13: STANDALONE
Standalone Revenue grew
to Rs. 2284.10 Cr, up 19% as against Rs. 1921.24 Cr in Q1 FY12.
PAT stood at Rs. 312.30 Cr as compared to Rs. 281.56 Cr in corresponding period last year due to strong operational performance inspite of the
reversal of revenues due to change in effective date of MYT regulations in Mumbai s impacting profits of
Rs 155 Cr. During the quarter, other income stood at 345.59 Cr as against Rs
247.58 Cr in the Q1 FY 12.
Commenting on the Company’s
performance, Mr. Anil Sardana, MD,said,
“During first quarter of FY13, the
Company reported revenue growth of about 20% and profit growth of about 10% which is highly satisfying. All our projects and subsidiaries by and
large have performed well. Tata Power‟s generation capacity crossed 6000 MW with
commissioning of 800 MW unit 2 of the Mundra UMPP, reinforcing our position as the largest integrated power
company in India. The Company crossed 11000 MWh of generation units at Mithapur
Solar plant which is a significant milestone that demonstrates efficiency and
state of art technology used at the plant. Our Coal Companies posted lower realization
due to global economic slowdown and falling coal prices.
By signing the coal supply agreement
with PT Antang Gunung Meratus, we have taken proactive steps to ensure imported
coal supply for our upcoming power projects to be developed for next 5 years.”
OPERATIONAL HIGHLIGHTS
During the quarter under review, the
Company continued its robust operations.
Sales volume for the quarter stood at 4227 MUs as compared to 3932 MUs in Q1
FY12. The overall generation was 4259 MUs up 10% as compared to 3889 MUs
reported in Q1 FY 12. Trombay Thermal Power Station generated 2542 MUs as
compared to 2445 MUs in the Q1 FY 12. Hydro Power Stations generated 389 MUs as
compared to 362 MUs. Jojobera Thermal Power Station generated 814MUs as
compared to 663 MUs and Haldia reported
generation of 227 MUs as compared
to 219 MUs in the corresponding quarter last year.
Industrial Energy Limited (IEL) reported generation of 457 MUs compared to 399
MUs. Wind
Farms performed well and generated
256 MUs compared to 154 MUs in Q1 FY 12.
Solar plant recorded generation of 1 MU as compared to 1 MU in Q1FY12.
KEY
SUBSIDIARIES
Coastal Gujarat Power Limited (CGPL):
CGPL, an SPV formed for setting up and operating the 4000 MW Mundra UMPP announced synchronization of its
800 MW sized Unit 2 on 19th
July and commercial operations on 30thJuly 2012. Unit 1 is in operation. Work
on Units 3, 4 and 5 of the project is on track And progressing well. Blending
of 70% has been achieved successfully
through eco-coal that has low sulphur and ash content. CGPL posted Revenues of
Rs. 285.07 Cr in Q1FY13. PAT stood at Rs. (164.78) Cr and is mainly due to first unit being
operational. The unexpected rise in coal price has not only affected our Mundra
project but all imported coal based projects. Senior leaders from the industry
met Hon‟ble
PM and requested PMO to resolve this issue. Further, Tata Power had contracted
coal from Indonesia on terms, which were mirror of bid tariff for coal for
CGPL. However, since Indonesian Government has changed the export norms for
coal from their country, Tata Power can‟t get imported coal based on
contracted terms. CGPL has also filed a petition with CERC for revision of
tariff.
Maithon Power Limited
(MPL): The 74:26 Joint Venture between Tata Power and Damodar Valley
Corporation (DVC) commissioned second Unit of 525 MW (Unit 2) in Dhanbad,
Jharkhand under the requisite standard requirements. The first Unit of 525 MW
(Unit 1) was commissioned in September 2011. Revenues for Q1FY13 stood at Rs.
192.53 Cr and PAT stood at Rs. (17.81) Cr.
Industrial Energy Limited (IEL): The Company reported Revenues of Rs. 145.22 Cr,
increase of 33% and PAT of Rs. 21.29 Cr, up 7% over last year.
Tata Power Renewable Energy Limited
(TPREL): 25 MW Solar plant in Mithapur
crossed 11000 MWh generation units milestone in record time. Q1FY13 Revenues
stood at Rs. 16.66 Cr and PAT was at Rs. 1.23 Cr.
Tata Power Delhi Distribution Limited:
This Joint-Venture with Delhi Government,
posted revenues of Rs. 1431 Cr up 16% compared to Q1 FY 12. PAT stood at
Rs.73.90 Cr and is not comparable mainly
because in the previous
year the Appellate Tribunal of Electricity had upheld certain
claims of the company. Consequently, an
amount of Rs 122.57 Crs had been accounted for as revenue during the quarter
ended 30th June 2011.
Powerlinks Transmission Limited
(Powerlinks): This first public-private Joint-Venture in power transmission in
India reported Revenues of Rs. 67.94 Cr in Q1 FY13 as compared to Rs.69.61 Cr
in Q1 FY12. PAT stood at Rs. 26.24 Cr, up 3% compared to Q1 FY12.
Tata Power Trading Company Limited (TPTCL): TPTCL traded a total
of 1615 MUs during the quarter, resulting in revenues of Rs. 644.16 Cr, compared to Rs. 662.14 in Q1 FY11. PAT stood at
Rs. 5.38 Cr, as compared to Rs. 5.85 Cr in Q1FY12.
Standard & Poor‟s Rating
Services (S&P) affirmed its „BB-„ long term corporate credit rating on Tata
Power and BB- issue rating on the Company‟s senior unsecured notes. At the same
time it revised its outlook on Tata Power to negative from stable.
GROWTH PLANS
Tata Power crossed 6000 MW capacity
mark. Some of the projects in pipeline are:
Kalinganagar, Orissa 3x67.5 MW (Gas based) +3x150 MW (Coal + gas
based): The project
is being executed through Industrial Energy Limited, a JV of the Company with
Tata Steel Limited. Tata Steel has obtained Environment Clearance (EC) for gas
based plant along with their steel plant. Civil construction work has commenced and order for major equipments have
been placed.
236 MW Dugar Hydro Power Project: Tata Power - SN Power Consortium JV
won the bid for 236 MW Dugar Hydro Power
Project in Himachal Pradesh. Pre-feasibility studies are under progress by the
joint project team. The project will primarily feed the Northern grid.
1600 MW Coastal Maharashtra Project: All statutory clearances required
to start the project implementation are in place. The Rehabilitation and Resettlement
(R & R) Authority of the Government of Maharashtra has approved the R & R proposal made by Tata Power.
Land acquisition is in progress. Economic options for coal sourcing and
logistics are under evaluation.
1980 MW Tiruldih Power Project, Jharkhand: The process of land acquisition for
the project is in progress. Inprinciple clearance has been received from
Railways for transportation of coal from Tubed Coal Block. The Company has successfully extended MoU
with Government of Jharkhand which is valid for 3 years.
660 MW Naraj Marthapur Project, Orissa:
The major clearances for the project have been obtained. The environment
clearance has been granted by MoEF, subject to clearance from National Board of
wild Life for which the process is on. Proposal for using clean technology is
also under discussion for this project.
International Projects:
Cennergi:
Department of Energy, Government of
South Africa announced Cennergi (our
South African Joint Venture with Exxaro) as preferred bidder for two wind
projects of 234 MW - Amakhala 139 MW and Tsitsikamma 95 MW projects.
Tata Power has signed a long term
coal supply agreement with PT Antang Gunung Meratus, Indonesia, a 100%
subsidiary of the Indonesian company PT Baramulti Sukses Sarana (“BSSR”). In order to secure the coal supplies, the
Company, through its 100% subsidiary Khopoli Investments Limited (“Khopoli”),
has also entered into an agreement which gives Khopoli an option, subject to
necessary approvals, to take up to a 26% stake
in BSSR. AGM and BSSR own
approximately 1 billion tonnes of coal resources in South and East Kalimantan
in Indonesia.
114 MW Dagachhu Project:
is being developed in partnership with The Royal Government of Bhutan (RGoB).
Major ordering for the project has
been completed and PPA for the entire quantum of power has been signed for the
project. The excavation of emergency tunnel and tail race tunnel completed.
Invert lining of connection tunnel is in progress. For Head race tunnel, more
than 55% of tunnel excavation completed. Cumulatively around 7 kms of
tunnelling has been completed. More than
99% of engineering and 95% of manufacturing activities are completed. Currently
assembly of Generator Transformers and erection of EOT crane in Power House is
in progress. All efforts are being made to commission the unit by 2013.
Geothermal Power: Tata Power along
with consortium partners Origin Energy and PT Supraco, won 240 MW Sorik Marapi Project in Indonesia. The
Environmental Permits were received in May, 2012. Application of Forestry
Permit is in the final stage of approval. The vendor for Engineering Design
& Quantity Survey contract has mobilized at site and work started.
Evaluation of vendors for General Civil Works is under finalization. On receipt
of the Letter of Assignment, kickoff meeting for PPA with State Power Off taker
was held in May, 2012.
About Tata Power:
The Company has an installed generation capacity of 6099
MW in India and a presence in all the segments of the power sector viz
Generation (thermal, hydro, solar and wind), Transmission, Distribution and
Trading. It has successful public-private partnerships in Generation,
Transmission and Distribution in India namely “Tata Power Delhi Distribution
Limited" with Delhi Vidyut Board for distribution in North Delhi, 'Powerlinks
Transmission Ltd.' with Power Grid Corporation of India Ltd. for evacuation of
Power from Tala hydro plant in Bhutan to Delhi and 'Maithon Power Ltd.' with
Damodar Valley Corporation for a 1050 MW Mega Power Project at Jharkhand. It is
one of the largest renewable energy players in India and is developing country‟s first 4000 MW
Ultra Mega Power Project at Mundra (Gujarat) based on super-critical
technology. Its international presence includes strategic investments in
Indonesia through 30% stake in coal mines and a geothermal project; in
Singapore through Trust Energy Resources to securitise coal supply and the
shipping of coal for its thermal power generation operations; in South Africa
through a joint venture called „Cennergi‟ to develop projects in South Africa,
Botswana and Namibia; in Australia through investments in enhanced geothermal
and clean coal technologies and in Bhutan through a hydro project in
partnership with The Royal Government of Bhutan. With its track record of
technology leadership, project execution excellence, world class safety
processes, customer care and driving green initiatives, Tata Power is poised
for a multi-fold growth and committed to 'lighting up lives' for generations to
come.
* *
* E N